Add and modify test cycles and test execution suites in Test Management 2.0

Add and modify test cycles and test execution suites from a single user interface without having to switch between multiple user interfaces and forms.

Before you begin

Role required: sn_test_management.test_manager

About this task

In Test Management 2.0, a test plan is broken into test cycles, and test cycles are broken into test execution suites. A test cycle represents a phase or iteration of testing within a test plan, such as regression testing or smoke testing. A test execution suite is the smallest unit of organization, containing the individual test assignments for testers.

Use the Planning tab to manage this hierarchy from a single view. For more information about key terms, see Test Management 2.0 overview.

Procedure

  1. Navigate to All > Test Management 2.0 > Test Board.

  2. Select the test plan.

  3. Select the Planning tab.

  4. Add or modify test plans and test execution suites in the Test plan work item hierarchy.

OptionDescription
To add a test cycle
  1. Select a test plan.
  2. Right-click and select Add Test Cycle, or click the add icon (
    Image omitted: add.png
    Add icon).</li>
To edit a test cycle in a form
  1. Select the test cycle.
  2. Right-click and select Edit.
To delete a test cycle with its test execution suites
  1. Select the test cycle.
  2. Right-click and select Delete.
To add a test execution suite
  1. Select a test cycle.
  2. Right-click and select Add Execution Suite, or click the add icon (
    Image omitted: add.png
    Add icon).</li>
To edit a test execution suite in a form
  1. Select the test execution suite.
  2. Right-click and select Edit.
To add tests to a test execution suite
  1. Select the test execution suite.
  2. Right-click and select Add tests.
To add test sets to a test execution suite
  1. Select the test execution suite.
  2. Right-click and select Add test sets.
To hide or display columns1. Click the gear icon \(
Image omitted: settings.png
Gear icon\).
2. Select or deselect the required check box. The column preferences are saved.
  1. View the summary or adjust the duration of a task in the Gantt chart.
OptionDescription
To view the summary of a taskPoint to a task to see the details of the task in a pop-up.
To change the planned start or end dates of a taskClick the task, and drag the left or right edge of the task bar to the required date.
To move a task to a new dateClick the task, and drag the whole task bar to a new date.
To zoom the calendar in or out

On the top of the calendar, click one of the time periods such as the month, or day. Then, select a Zoom Level from the calendar.

Image omitted: zoom_level.png
Calendar options.</p>

When the zoom level in calender is selected as Auto Fit, the Gantt view fits in one page so that you can view the entire timeline for the test plan without using the scrollbar.

Parent Topic:Test Board in Test Management 2.0