Manage connected work item types in CWM
Enable, disable, refresh data, or delete the connected work item types on your CWM Board to keep the work items up to date based on changing requirements.
Before you begin
Role required: sn_cwm.cwm_user
Procedure
Navigate to Workspaces > Collaborative Work Management.
From a Space, select the Board that you want to manage the connected work item types for.
From the Board header, select Connected work.
Image omitted: cwm-connected-work-header.png
Connect work option in the CWM Board header.
Connect work option in the CWM Board header.
- From the Manage connected work modal, disable or enable any existing work item type.
Image omitted: cwm-connected-work-disable-enable.gif
Enable or disable any connected work item type for a CWM Board.
Enable or disable any connected work item type for a CWM Board.
- Update the filter conditions for a work item type by selecting Edit from the More actions menu (
Image omitted: cwm-icon-page-actions.png
More actions icon.\).
More actions icon.\).
For more information, see [Update filter conditions for connected work in CWM](update-conditions-for-connected-work-in-cwm.md).
- Select Refresh data from the More actions menu (
Image omitted: cwm-icon-page-actions.png
More actions icon.\) to fetch any latest records for the work item type that you defined.
More actions icon.\) to fetch any latest records for the work item type that you defined.
Image omitted: cwm-connected-work-more-options.png
Choose to edit, refresh data, or delete a connected work item type configuration for a CWM Board.
Choose to edit, refresh data, or delete a connected work item type configuration for a CWM Board.
If the work item type is no longer necessary, you can delete it.
- From the More actions menu (
Image omitted: cwm-icon-page-actions.png
More actions icon.\) of a work item type configuration, select **Delete**.
More actions icon.\) of a work item type configuration, select **Delete**.
2. From the Delete configuration modal, select **Confirm**.
- After you have done all the required changes, select Save.
Result
The Board is refreshed to load the work items based on your changes.
Parent Topic:Connected work in CWM