Skip to content
Release: Australia · Updated: 2026-03-12 · Official documentation · View source

Create a control test from an engagement

Create a control test that runs periodically and provides documented evidence of whether the associated control is operating correctly or not.

Before you begin

Role required: sn_audit.manager, sn_audit_ws.supervisor

Procedure

  1. Navigate to All > Audit > Audit Workspace.

  2. Select the lists icon (

Image omitted: ListsIcon.jpg
List icon.\).
  1. Select All engagements or My engagements in the Execution list.

    Assign an audit task to an engagement that is in one of the following states:

    • Validate
    • Fieldwork
    • Select the link to the engagement record in the Name column.

    The engagement record details open in the Overview tab.

  2. Select the Audit tasks related list.

  3. Click the grouped button below the related lists and select New control test from the list.

  4. On the form, fill in the fields.

FieldDescription
NumberUnique identification number.
NameName of the control test.
ParentParent engagement.
Test planTest plan associated with this control test.
StateState of the control test. The default state is Open.
Control effectivenessControl effectiveness.
IssueIssue related to this control test.
Assignment
Assigned toUser assigned to the control test.
Schedule
Planned start dateIntended start date of the control test.
Planned end dateIntended end date of the control test.
Planned durationExpected duration of the control test. As with actual duration, the planned duration shows total activity time and takes the control test schedule into consideration.
Actual start dateActual start date of the control test.
Actual end dateActual end date of the control test.
Actual durationDuration of the control test from control test start to control test closure.
Design test
Design effectiveness- None - Effective - Ineffective
Design expectationsBasic requirement that should be met for a control to be effective. This field checks if the control was designed properly to achieve the control objective.
Design assessment proceduresProcedure or steps to be followed to conclude whether the design of the control is effective to achieve the control objective or not. This procedure is based on the design expectation.
Design resultsResults of testing the design of the control based on the design assessment procedure.
Operational test
Operating effectiveness- None - Effective - Ineffective
Operational expectationsExpectations that should be met to ensure that the control is operating effectively to achieve the control objective.
Operational assessment proceduresDetailed steps, to carry out the operational expectations, which must be performed to conclude that the control is operating successfully.
Operational resultsResults of testing the operation of the control based on the operation assessment procedure.
Activity
Work notes \(Private\)Comments that the audit manager and audit supervisor can only view.
Additional commentsComments that customers can also view.
Confidentiality
ConfidentialOption to enable confidentiality of the record. Only the assigned confidential users or confidential groups of users can access the record.For more information on the confidential option, see Confidentiality flag for audit and compliance records.
  1. Select Save.

    You can view the description and monitor the state of the control test in the State banner of the Overview page as the record progresses through the control test process flows.